Achhnera Bypass A Cabin – Achhnera Bypass B Cabin
Achhnera Bypass A Cabin – Achhnera Bypass B Cabin (YY-AHA–YY-AHB) railway line: 1 km, single electric broad gauge. 2 stations and 14 trains, North Central Railway.
- Length
- 1 km
- Trains
- 14 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- YY-AHA YY-AHA 0.0 km
- YY-AHB YY-AHB 1.0 km
Quick answers
How long is the Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line?
The Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line is about 1 km long, with 2 stations.
Is the Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line electrified?
Yes. The Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line is electrified: trains run on electric power from overhead wires.
Is Achhnera Bypass A Cabin – Achhnera Bypass B Cabin a single or double line?
The Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line?
14 trains run over the Achhnera Bypass A Cabin – Achhnera Bypass B Cabin line.