RailTribe
Lines
Map
Trains
Line

Anuppur Junction – Boridand Junction

Anuppur Junction – Boridand Junction (APR–BRND) railway line: 56 km, double electric broad gauge. 8 stations and 23 trains, South East Central Railway.

Length
56 km
Trains
23 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 8

  1. Anuppur Jn APR 0.0 km
  2. Mauhari MZH 7.7 km
  3. Dhurwasin DRSN 15.7 km
  4. Harrad HRV 22.6 km
  5. Kotma KTMA 31.6 km
  6. Baihatola BATL 41.9 km
  7. Bijuri BJRI 47.3 km
  8. Boridand Jn BRND 56.1 km

Quick answers

How long is the Anuppur Junction – Boridand Junction line?

The Anuppur Junction – Boridand Junction line is about 56 km long, with 8 stations.

Is the Anuppur Junction – Boridand Junction line electrified?

Yes. The Anuppur Junction – Boridand Junction line is electrified: trains run on electric power from overhead wires.

Is Anuppur Junction – Boridand Junction a single or double line?

The Anuppur Junction – Boridand Junction line is a double line. One track for each direction, so trains do not wait to cross.

How many trains use the Anuppur Junction – Boridand Junction line?

23 trains run over the Anuppur Junction – Boridand Junction line.

Indian railway atlas