RailTribe
Lines
Map
Trains
Line

Anuppur Junction – New Katni Outer Cabin

Anuppur Junction – New Katni Outer Cabin (APR–XX-KMZO) railway line: 160 km, triple electric broad gauge. 19 stations and 70 trains, South East Central Railway.

Length
160 km
Trains
70 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Triple lineAn extra track that lets more trains run.

Stations on this line · 19

  1. Anuppur Jn APR 0.0 km
  2. Amlai AAL 12.6 km
  3. Burhar BUH 21.3 km
  4. Chhada CHDX 26.8 km
  5. Singhpur SNGP 34.9 km
  6. Shahdol SDL 40.8 km
  7. Badhwabara BDWA 49.3 km
  8. Ghunghuti GGT 61.9 km
  9. Mudaria MDXR 72.7 km
  10. Birsinghpur BRS 78.2 km
  11. Nowrozabad NRZB 85.4 km
  12. Karkeli KKI 95.4 km
  13. Umaria UMR 108.0 km
  14. Lorha LOA 118.1 km
  15. Chandia Road CHD 127.0 km
  16. Vilayatkalan Road VYK 139.6 km
  17. Rupaund RPD 143.9 km
  18. Jhalwara JLW 156.0 km
  19. XX-KMZO XX-KMZO 160.1 km

Quick answers

How long is the Anuppur Junction – New Katni Outer Cabin line?

The Anuppur Junction – New Katni Outer Cabin line is about 160 km long, with 19 stations.

Is the Anuppur Junction – New Katni Outer Cabin line electrified?

Yes. The Anuppur Junction – New Katni Outer Cabin line is electrified: trains run on electric power from overhead wires.

Is Anuppur Junction – New Katni Outer Cabin a single or double line?

The Anuppur Junction – New Katni Outer Cabin line is a triple line. An extra track that lets more trains run.

How many trains use the Anuppur Junction – New Katni Outer Cabin line?

70 trains run over the Anuppur Junction – New Katni Outer Cabin line.

Indian railway atlas