RailTribe
Lines
Map
Trains
Line

Asthal Bohar Junction – Rewari Outer Cabin

Asthal Bohar Junction – Rewari Outer Cabin (ABO–XX-REO) railway line: 74 km, single electric broad gauge. 7 stations and 12 trains, Northern Railway.

Length
74 km
Trains
12 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 7

  1. Asthal Bohar Jn ABO 0.0 km
  2. Dighal DGHL 14.3 km
  3. Jhajjar JHJ 31.0 km
  4. Machhrauli MHRI 43.0 km
  5. Palhawas PLHW 57.2 km
  6. Gokalgarh GKG 69.9 km
  7. XX-REO XX-REO 74.1 km

Quick answers

How long is the Asthal Bohar Junction – Rewari Outer Cabin line?

The Asthal Bohar Junction – Rewari Outer Cabin line is about 74 km long, with 7 stations.

Is the Asthal Bohar Junction – Rewari Outer Cabin line electrified?

Yes. The Asthal Bohar Junction – Rewari Outer Cabin line is electrified: trains run on electric power from overhead wires.

Is Asthal Bohar Junction – Rewari Outer Cabin a single or double line?

The Asthal Bohar Junction – Rewari Outer Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Asthal Bohar Junction – Rewari Outer Cabin line?

12 trains run over the Asthal Bohar Junction – Rewari Outer Cabin line.

Indian railway atlas