RailTribe
Lines
Map
Trains
Line

Ateli – Narnaul

Ateli – Narnaul (AEL–NNL) railway line: 14 km, double electric broad gauge. 19 stations and 28 trains, North Western Railway.

Length
14 km
Speed limit
110 km/h
Trains
28 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 19

  1. Rewari Jn RE 0.0 km
  2. Khori KORI 10.9 km
  3. Pali PALI 16.3 km
  4. Kund KUND 23.0 km
  5. Kathuwas KTWS 28.0 km
  6. Ateli AEL 37.6 km
  7. Mirzapur Bachhaud MBV 44.5 km
  8. Narnaul NNL 51.9 km
  9. Amarpur Jorasi APJ 59.7 km
  10. Nizampur NIP 66.1 km
  11. Dabla DBLA 77.3 km
  12. Jhilo JLLO 85.0 km
  13. Maonda MADA 92.5 km
  14. Nim Ka Thana NMK 101.8 km
  15. Bhagega BAGA 111.0 km
  16. Kanwat KAWT 122.3 km
  17. Kachera KHRA 129.3 km
  18. Shri Madhopur SMPR 138.7 km
  19. Ringas Jn RGS 148.7 km

Quick answers

How long is the Ateli – Narnaul line?

The Ateli – Narnaul line is about 14 km long, with 19 stations.

Is the Ateli – Narnaul line electrified?

Yes. The Ateli – Narnaul line is electrified: trains run on electric power from overhead wires.

Is Ateli – Narnaul a single or double line?

The Ateli – Narnaul line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Ateli and Narnaul?

Trains can run at up to 110 km/h between Ateli and Narnaul.

How many trains use the Ateli – Narnaul line?

28 trains run over the Ateli – Narnaul line.

Indian railway atlas