RailTribe
Lines
Map
Trains
Line

Badarpur Junction – Karimganj Junction

Badarpur Junction – Karimganj Junction (BPB–KXJ) railway line: 20 km, single electric broad gauge. 33 stations and 26 trains, Northeast Frontier Railway.

Length
20 km
Speed limit
100 km/h
Trains
26 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 33

  1. Lumding Jn LMG 0.0 km
  2. Lumding Jn LMGF 0.1 km
  3. Lumding South Cabin LMGS 2.1 km
  4. Manderdisa Jn MYD 10.2 km
  5. Hatikhali HTL 19.9 km
  6. Dibolong DBLG 26.0 km
  7. Dijaobra DJB 30.6 km
  8. Langting LGT 38.4 km
  9. Dihakho DKE 46.9 km
  10. Mupa MUPA 54.3 km
  11. Kalachand KQI 58.5 km
  12. Maibang MBG 63.5 km
  13. Wadrengdisa WDA 70.4 km
  14. Daotuhaja DJA 73.4 km
  15. Phiding PDJ 82.8 km
  16. Mahur MXR 88.3 km
  17. Migrendisa MGE 93.0 km
  18. New Haflong NHLG 98.0 km
  19. Jatinga Lampur JGLP 109.2 km
  20. New Harangajao NHGJ 118.9 km
  21. Ditokcherra DTC 127.0 km
  22. Bandarkhal BXK 131.5 km
  23. Damchara DCA 140.0 km
  24. Chandranathpur CNE 148.9 km
  25. Bihara BHZ 153.4 km
  26. Hilara HLX 158.0 km
  27. Sukritipur SQF 163.4 km
  28. Badarpur Jn BPB 169.1 km
  29. Rupasibari RPB 172.2 km
  30. Bhanga BXG 177.1 km
  31. Chargola CGX 183.1 km
  32. New Karimganj Jn NKMG 186.4 km
  33. Karimganj Jn KXJ 189.2 km

Quick answers

How long is the Badarpur Junction – Karimganj Junction line?

The Badarpur Junction – Karimganj Junction line is about 20 km long, with 33 stations.

Is the Badarpur Junction – Karimganj Junction line electrified?

Yes. The Badarpur Junction – Karimganj Junction line is electrified: trains run on electric power from overhead wires.

Is Badarpur Junction – Karimganj Junction a single or double line?

The Badarpur Junction – Karimganj Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Badarpur Junction and Karimganj Junction?

Trains can run at up to 100 km/h between Badarpur Junction and Karimganj Junction.

How many trains use the Badarpur Junction – Karimganj Junction line?

26 trains run over the Badarpur Junction – Karimganj Junction line.

Indian railway atlas