RailTribe
Lines
Map
Trains
Line

Badnera Bypass Cabin – New Amravati Outer Cabin

Badnera Bypass Cabin – New Amravati Outer Cabin (XX-BDBY–YY-NAVO) railway line: 1 km, single electric broad gauge. 2 stations and 36 trains, Central Railway.

Length
1 km
Trains
36 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 2

  1. XX-BDBY XX-BDBY 0.0 km
  2. YY-NAVO YY-NAVO 0.6 km

Quick answers

How long is the Badnera Bypass Cabin – New Amravati Outer Cabin line?

The Badnera Bypass Cabin – New Amravati Outer Cabin line is about 1 km long, with 2 stations.

Is the Badnera Bypass Cabin – New Amravati Outer Cabin line electrified?

Yes. The Badnera Bypass Cabin – New Amravati Outer Cabin line is electrified: trains run on electric power from overhead wires.

Is Badnera Bypass Cabin – New Amravati Outer Cabin a single or double line?

The Badnera Bypass Cabin – New Amravati Outer Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Badnera Bypass Cabin – New Amravati Outer Cabin line?

36 trains run over the Badnera Bypass Cabin – New Amravati Outer Cabin line.

Indian railway atlas