RailTribe
Lines
Map
Trains
Line

Baiguda – Koraput b Cabin B.h

Baiguda – Koraput b Cabin B.h (BGUA–KRPB) railway line: 32 km, double electric broad gauge. 14 stations and 10 trains, East Coast Railway.

Length
32 km
Speed limit
70 km/h
Trains
10 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 14

  1. Singapur Road A Cabin SPAC 0.0 km
  2. Keutguda KTGA 7.3 km
  3. Sikarpai SKPI 22.8 km
  4. Bhalumaska BLMK 32.3 km
  5. Lelligumma LLGM 49.5 km
  6. Rauli RUL 66.2 km
  7. Tikiri TKRI 78.5 km
  8. Singaram SGRM 86.7 km
  9. Laxmipur Road LKMR 100.0 km
  10. Kakiriguma KKGM 115.4 km
  11. Baiguda BGUA 128.0 km
  12. Damanjodi DMNJ 142.5 km
  13. Dumuriput DMRT 150.7 km
  14. Koraput b Cabin B.h KRPB 159.8 km

Quick answers

How long is the Baiguda – Koraput b Cabin B.h line?

The Baiguda – Koraput b Cabin B.h line is about 32 km long, with 14 stations.

Is the Baiguda – Koraput b Cabin B.h line electrified?

Yes. The Baiguda – Koraput b Cabin B.h line is electrified: trains run on electric power from overhead wires.

Is Baiguda – Koraput b Cabin B.h a single or double line?

The Baiguda – Koraput b Cabin B.h line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Baiguda and Koraput b Cabin B.h?

Trains can run at up to 70 km/h between Baiguda and Koraput b Cabin B.h.

How many trains use the Baiguda – Koraput b Cabin B.h line?

10 trains run over the Baiguda – Koraput b Cabin B.h line.

Indian railway atlas