RailTribe
Lines
Map
Trains
Line

Balangir Junction – Sambalpur Junction

Balangir Junction – Sambalpur Junction (BLGR–SBP) railway line: 119 km, double electric broad gauge. 12 stations and 124 trains, East Coast Railway.

Length
119 km
Speed limit
110 km/h
Trains
124 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 12

  1. Balangir Jn BLGR 0.0 km
  2. Balangir Road BNRD 2.2 km
  3. Loisingha LSX 18.6 km
  4. Khaliapali KHPL 30.1 km
  5. Dungripali DJX 42.8 km
  6. Barpali BRPL 57.1 km
  7. Bargarh Road BRGA 76.3 km
  8. Deobahal DOBH 88.2 km
  9. Attabira ATS 94.3 km
  10. Godbhaga GBQ 101.9 km
  11. Hirakud HKG 111.4 km
  12. Sambalpur Jn SBP 118.7 km

Quick answers

How long is the Balangir Junction – Sambalpur Junction line?

The Balangir Junction – Sambalpur Junction line is about 119 km long, with 12 stations.

Is the Balangir Junction – Sambalpur Junction line electrified?

Yes. The Balangir Junction – Sambalpur Junction line is electrified: trains run on electric power from overhead wires.

Is Balangir Junction – Sambalpur Junction a single or double line?

The Balangir Junction – Sambalpur Junction line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Balangir Junction and Sambalpur Junction?

Trains can run at up to 110 km/h between Balangir Junction and Sambalpur Junction.

How many trains use the Balangir Junction – Sambalpur Junction line?

124 trains run over the Balangir Junction – Sambalpur Junction line.

Indian railway atlas