Banaras – Prayagraj Junction
Banaras – Prayagraj Junction (BNRS–PRYJ) railway line: 121 km, double electric broad gauge. 23 stations and 118 trains, North Eastern Railway.
- Length
- 121 km
- Speed limit
- 110 km/h
- Trains
- 118 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 23
- Banaras BNRS 0.0 km
- Bhulanpur BHLP 2.2 km
- Hardattpur HDT 7.4 km
- Raja Talab RTB 13.2 km
- Baherwa Halt BRWH 19.3 km
- Nigatpur NTU 22.6 km
- Kachhwa Road KWH 27.8 km
- Katka KFK 35.1 km
- Madhosingh MBS 43.4 km
- Ahimanpur AHM 47.5 km
- Almau Halt ALMW 51.3 km
- Gyanpur Road GYN 56.5 km
- Sarai Jagdish SJGH 63.1 km
- Jangiganj JGG 64.8 km
- Atraura Halt ATRR 70.3 km
- Bhiti BYH 74.2 km
- Handia Khas HDK 81.7 km
- Saidabad SDC 89.1 km
- Ramnathpur RTR 100.0 km
- Jhusi JI 110.8 km
- Daraganj DRGJ 114.7 km
- Prayagraj Rambag PRRB 118.1 km
- Prayagraj Jn PRYJ 120.6 km
Quick answers
How long is the Banaras – Prayagraj Junction line?
The Banaras – Prayagraj Junction line is about 121 km long, with 23 stations.
Is the Banaras – Prayagraj Junction line electrified?
Yes. The Banaras – Prayagraj Junction line is electrified: trains run on electric power from overhead wires.
Is Banaras – Prayagraj Junction a single or double line?
The Banaras – Prayagraj Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Banaras and Prayagraj Junction?
Trains can run at up to 110 km/h between Banaras and Prayagraj Junction.
How many trains use the Banaras – Prayagraj Junction line?
118 trains run over the Banaras – Prayagraj Junction line.