Baraigram Junction – Dullabcherra
Baraigram Junction – Dullabcherra (BRGM–DLCR) railway line: 29 km, single electric broad gauge. 7 stations and 6 trains, Northeast Frontier Railway.
- Length
- 29 km
- Speed limit
- 60 km/h
- Trains
- 6 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 7
- Baraigram Jn BRGM 0.0 km
- Eraligul ELL 3.6 km
- Phakhoagram PKGM 8.2 km
- Bazarghat BZGT 14.3 km
- Ratabari RTBR 19.0 km
- Anipur APU 22.2 km
- Dullabcherra DLCR 29.0 km
Quick answers
How long is the Baraigram Junction – Dullabcherra line?
The Baraigram Junction – Dullabcherra line is about 29 km long, with 7 stations.
Is the Baraigram Junction – Dullabcherra line electrified?
Yes. The Baraigram Junction – Dullabcherra line is electrified: trains run on electric power from overhead wires.
Is Baraigram Junction – Dullabcherra a single or double line?
The Baraigram Junction – Dullabcherra line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Baraigram Junction and Dullabcherra?
Trains can run at up to 60 km/h between Baraigram Junction and Dullabcherra.
How many trains use the Baraigram Junction – Dullabcherra line?
6 trains run over the Baraigram Junction – Dullabcherra line.