RailTribe
Lines
Map
Trains
Line

Barauni Chord Cabin – Barauni Junction

Barauni Chord Cabin – Barauni Junction (YY-BJUC–BJU) railway line: 2 km, double electric broad gauge. 2 stations and 95 trains, East Central Railway.

Length
2 km
Trains
95 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 2

  1. YY-BJUC YY-BJUC 0.0 km
  2. Barauni Jn BJU 1.6 km

Quick answers

How long is the Barauni Chord Cabin – Barauni Junction line?

The Barauni Chord Cabin – Barauni Junction line is about 2 km long, with 2 stations.

Is the Barauni Chord Cabin – Barauni Junction line electrified?

Yes. The Barauni Chord Cabin – Barauni Junction line is electrified: trains run on electric power from overhead wires.

Is Barauni Chord Cabin – Barauni Junction a single or double line?

The Barauni Chord Cabin – Barauni Junction line is a double line. One track for each direction, so trains do not wait to cross.

How many trains use the Barauni Chord Cabin – Barauni Junction line?

95 trains run over the Barauni Chord Cabin – Barauni Junction line.

Indian railway atlas