Barauni Chord Cabin – New Barauni Junction
Barauni Chord Cabin – New Barauni Junction (YY-BJUC–NBJU) railway line: 1 km, single electric broad gauge. 2 stations and 36 trains, East Central Railway.
- Length
- 1 km
- Trains
- 36 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- YY-BJUC YY-BJUC 0.0 km
- New Barauni Jn NBJU 1.2 km
Quick answers
How long is the Barauni Chord Cabin – New Barauni Junction line?
The Barauni Chord Cabin – New Barauni Junction line is about 1 km long, with 2 stations.
Is the Barauni Chord Cabin – New Barauni Junction line electrified?
Yes. The Barauni Chord Cabin – New Barauni Junction line is electrified: trains run on electric power from overhead wires.
Is Barauni Chord Cabin – New Barauni Junction a single or double line?
The Barauni Chord Cabin – New Barauni Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Barauni Chord Cabin – New Barauni Junction line?
36 trains run over the Barauni Chord Cabin – New Barauni Junction line.