RailTribe
Lines
Map
Trains
Line

Barauni Chord Cabin – New Barauni Junction

Barauni Chord Cabin – New Barauni Junction (YY-BJUC–NBJU) railway line: 1 km, single electric broad gauge. 2 stations and 36 trains, East Central Railway.

Length
1 km
Trains
36 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 2

  1. YY-BJUC YY-BJUC 0.0 km
  2. New Barauni Jn NBJU 1.2 km

Quick answers

How long is the Barauni Chord Cabin – New Barauni Junction line?

The Barauni Chord Cabin – New Barauni Junction line is about 1 km long, with 2 stations.

Is the Barauni Chord Cabin – New Barauni Junction line electrified?

Yes. The Barauni Chord Cabin – New Barauni Junction line is electrified: trains run on electric power from overhead wires.

Is Barauni Chord Cabin – New Barauni Junction a single or double line?

The Barauni Chord Cabin – New Barauni Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Barauni Chord Cabin – New Barauni Junction line?

36 trains run over the Barauni Chord Cabin – New Barauni Junction line.

Indian railway atlas