Barejadi Nandej – Nadiad Junction
Barejadi Nandej – Nadiad Junction (BJD–ND) railway line: 29 km, double electric broad gauge. 13 stations and 297 trains, Western Railway.
- Length
- 29 km
- Speed limit
- 130 km/h
- Trains
- 297 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 13
- Ahmedabad Jn ADI 0.0 km
- Kankaria KKF 2.0 km
- Kankaria South Cabin KKEC 2.0 km
- Maninagar MAN 3.4 km
- Vatva VTA 8.1 km
- Vatva Yard VY 8.9 km
- Geratpur GER 13.5 km
- Barejadi Nandej BJD 16.8 km
- Kanij KANJ 21.1 km
- Nenpur NEP 24.3 km
- Mahemdavad Kheda Road MHD 28.2 km
- Gothaj GTE 36.6 km
- Nadiad Jn ND 45.8 km
Quick answers
How long is the Barejadi Nandej – Nadiad Junction line?
The Barejadi Nandej – Nadiad Junction line is about 29 km long, with 13 stations.
Is the Barejadi Nandej – Nadiad Junction line electrified?
Yes. The Barejadi Nandej – Nadiad Junction line is electrified: trains run on electric power from overhead wires.
Is Barejadi Nandej – Nadiad Junction a single or double line?
The Barejadi Nandej – Nadiad Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Barejadi Nandej and Nadiad Junction?
Trains can run at up to 130 km/h between Barejadi Nandej and Nadiad Junction.
How many trains use the Barejadi Nandej – Nadiad Junction line?
297 trains run over the Barejadi Nandej – Nadiad Junction line.