Barharwa Junction – Bonidanga
Barharwa Junction – Bonidanga (BHW–BDAG) railway line: 5 km, double electric broad gauge. 2 stations and 34 trains, Eastern Railway.
- Length
- 5 km
- Speed limit
- 110 km/h
- Trains
- 34 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 2
- Barharwa Jn BHW 0.0 km
- Bonidanga BDAG 5.3 km
Quick answers
How long is the Barharwa Junction – Bonidanga line?
The Barharwa Junction – Bonidanga line is about 5 km long, with 2 stations.
Is the Barharwa Junction – Bonidanga line electrified?
Yes. The Barharwa Junction – Bonidanga line is electrified: trains run on electric power from overhead wires.
Is Barharwa Junction – Bonidanga a single or double line?
The Barharwa Junction – Bonidanga line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Barharwa Junction and Bonidanga?
Trains can run at up to 110 km/h between Barharwa Junction and Bonidanga.
How many trains use the Barharwa Junction – Bonidanga line?
34 trains run over the Barharwa Junction – Bonidanga line.