Barharwa Junction – Bonidanga Link Cabin
Barharwa Junction – Bonidanga Link Cabin (BHW–BDLC) railway line: 5 km, double electric broad gauge. 12 stations and 20 trains, Eastern Railway.
- Length
- 5 km
- Speed limit
- 100 km/h
- Trains
- 20 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 12
- Barharwa Jn BHW 0.0 km
- Bonidanga Link Cabin BDLC 4.7 km
- Gumani GMAN 7.4 km
- Kotalpukur KLP 14.1 km
- Tilbhita TBB 21.6 km
- Pakur PKR 26.1 km
- Nagarnabi NGF 31.5 km
- Rajgram RJG 36.6 km
- Banshlai Bridge BSBR 43.3 km
- Murarai MRR 48.3 km
- Chatra CTR 56.0 km
- Nalhati Jn NHT 64.7 km
Quick answers
How long is the Barharwa Junction – Bonidanga Link Cabin line?
The Barharwa Junction – Bonidanga Link Cabin line is about 5 km long, with 12 stations.
Is the Barharwa Junction – Bonidanga Link Cabin line electrified?
Yes. The Barharwa Junction – Bonidanga Link Cabin line is electrified: trains run on electric power from overhead wires.
Is Barharwa Junction – Bonidanga Link Cabin a single or double line?
The Barharwa Junction – Bonidanga Link Cabin line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Barharwa Junction and Bonidanga Link Cabin?
Trains can run at up to 100 km/h between Barharwa Junction and Bonidanga Link Cabin.
How many trains use the Barharwa Junction – Bonidanga Link Cabin line?
20 trains run over the Barharwa Junction – Bonidanga Link Cabin line.