RailTribe
Lines
Map
Trains
Line

Barwa Sagar – Rora

Barwa Sagar – Rora (BWR–RORA) railway line: 52 km, double electric broad gauge. 15 stations and 24 trains, North Central Railway.

Length
52 km
Speed limit
110 km/h
Trains
24 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 15

  1. VGL Jhansi Jn VGLJ 0.0 km
  2. Orchha ORC 11.3 km
  3. Barwa Sagar BWR 21.7 km
  4. Niwari NEW 31.0 km
  5. Magarpur MGRR 35.1 km
  6. Teharka TKA 43.0 km
  7. Ranipur Road RNRD 53.9 km
  8. Mau Ranipur MRPR 64.1 km
  9. Rora RORA 73.6 km
  10. Harpalpur HPP 84.9 km
  11. Ghutai GTI 95.8 km
  12. Bela Tal BTX 107.5 km
  13. Kulpahar KLAR 116.2 km
  14. Charkhari Road CRC 127.1 km
  15. Mahoba Jn MBA 137.6 km

Quick answers

How long is the Barwa Sagar – Rora line?

The Barwa Sagar – Rora line is about 52 km long, with 15 stations.

Is the Barwa Sagar – Rora line electrified?

Yes. The Barwa Sagar – Rora line is electrified: trains run on electric power from overhead wires.

Is Barwa Sagar – Rora a single or double line?

The Barwa Sagar – Rora line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Barwa Sagar and Rora?

Trains can run at up to 110 km/h between Barwa Sagar and Rora.

How many trains use the Barwa Sagar – Rora line?

24 trains run over the Barwa Sagar – Rora line.

Indian railway atlas