RailTribe
Lines
Map
Trains
Line

Barwadih – Chhipadohar

Barwadih – Chhipadohar (BRWD–CPDR) railway line: 8 km, triple electric broad gauge. 10 stations and 48 trains, East Central Railway.

Length
8 km
Trains
48 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Triple lineAn extra track that lets more trains run.

Stations on this line · 10

  1. Barwadih BRWD 0.0 km
  2. Chhipadohar CPDR 8.4 km
  3. Hehegara Halt HHG 17.1 km
  4. Kumandih KMND 26.7 km
  5. Bendi BFQ 34.4 km
  6. Latehar LTHR 40.4 km
  7. Demu DEMU 46.6 km
  8. Richughuta RCGT 55.1 km
  9. Chetar CTQ 63.4 km
  10. Tori Jn TORI 73.0 km

Quick answers

How long is the Barwadih – Chhipadohar line?

The Barwadih – Chhipadohar line is about 8 km long, with 10 stations.

Is the Barwadih – Chhipadohar line electrified?

Yes. The Barwadih – Chhipadohar line is electrified: trains run on electric power from overhead wires.

Is Barwadih – Chhipadohar a single or double line?

The Barwadih – Chhipadohar line is a triple line. An extra track that lets more trains run.

How many trains use the Barwadih – Chhipadohar line?

48 trains run over the Barwadih – Chhipadohar line.

Indian railway atlas