Belthara Road – Lar Road
Belthara Road – Lar Road (BLTR–LRD) railway line: 13 km, single electric broad gauge. 9 stations and 50 trains, North Eastern Railway.
- Length
- 13 km
- Speed limit
- 100 km/h
- Trains
- 50 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 9
- Indara Jn IAA 0.0 km
- XX-IAAO XX-IAAO 0.9 km
- Chakra Road CKYD 5.6 km
- Kiriharapur KER 13.5 km
- Gobindpur Dugauli Halt GOX 20.0 km
- Belthara Road BLTR 27.1 km
- Turtipar TTI 33.9 km
- Lar Road LRD 40.1 km
- Salempur Jn SRU 49.6 km
Quick answers
How long is the Belthara Road – Lar Road line?
The Belthara Road – Lar Road line is about 13 km long, with 9 stations.
Is the Belthara Road – Lar Road line electrified?
Yes. The Belthara Road – Lar Road line is electrified: trains run on electric power from overhead wires.
Is Belthara Road – Lar Road a single or double line?
The Belthara Road – Lar Road line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Belthara Road and Lar Road?
Trains can run at up to 100 km/h between Belthara Road and Lar Road.
How many trains use the Belthara Road – Lar Road line?
50 trains run over the Belthara Road – Lar Road line.