Bethampudi Junction – Saravaram
Bethampudi Junction – Saravaram (BTPD–SAVR) railway line: 6 km, single electric broad gauge. 2 stations, South Central Railway.
- Length
- 6 km
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- Bethampudi Jn BTPD 0.0 km
- Saravaram SAVR 6.0 km
Quick answers
How long is the Bethampudi Junction – Saravaram line?
The Bethampudi Junction – Saravaram line is about 6 km long, with 2 stations.
Is the Bethampudi Junction – Saravaram line electrified?
Yes. The Bethampudi Junction – Saravaram line is electrified: trains run on electric power from overhead wires.
Is Bethampudi Junction – Saravaram a single or double line?
The Bethampudi Junction – Saravaram line is a single line. Trains in both directions share one track and wait at stations to cross.