RailTribe
Lines
Map
Trains
Line

Bhuteshwar – Alwar Chord Cabin

Bhuteshwar – Alwar Chord Cabin (BTSR–XX-AWRC) railway line: 117 km, single electric broad gauge. 16 stations and 16 trains, North Central Railway.

Length
117 km
Trains
16 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 16

  1. Bhuteshwar BTSR 0.0 km
  2. Mora MROA 9.1 km
  3. Radhakund RAKD 16.4 km
  4. Goverdhan GDO 23.3 km
  5. Vehaj BEHJ 32.3 km
  6. Deeg DEEG 38.5 km
  7. Bedham BEDM 50.6 km
  8. Barsana BARS 56.9 km
  9. Brij Nagar BINR 62.9 km
  10. Jhareda JREA 69.6 km
  11. Govind Garh GVH 75.0 km
  12. Jadoli Ka Bas JBS 86.6 km
  13. Ramgarh RAH 95.1 km
  14. Ootwar OTD 105.7 km
  15. Gazika GZKA 113.9 km
  16. XX-AWRC XX-AWRC 117.2 km

Quick answers

How long is the Bhuteshwar – Alwar Chord Cabin line?

The Bhuteshwar – Alwar Chord Cabin line is about 117 km long, with 16 stations.

Is the Bhuteshwar – Alwar Chord Cabin line electrified?

Yes. The Bhuteshwar – Alwar Chord Cabin line is electrified: trains run on electric power from overhead wires.

Is Bhuteshwar – Alwar Chord Cabin a single or double line?

The Bhuteshwar – Alwar Chord Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Bhuteshwar – Alwar Chord Cabin line?

16 trains run over the Bhuteshwar – Alwar Chord Cabin line.

Indian railway atlas