Bhuteshwar – Alwar Chord Cabin
Bhuteshwar – Alwar Chord Cabin (BTSR–XX-AWRC) railway line: 117 km, single electric broad gauge. 16 stations and 16 trains, North Central Railway.
- Length
- 117 km
- Trains
- 16 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 16
- Bhuteshwar BTSR 0.0 km
- Mora MROA 9.1 km
- Radhakund RAKD 16.4 km
- Goverdhan GDO 23.3 km
- Vehaj BEHJ 32.3 km
- Deeg DEEG 38.5 km
- Bedham BEDM 50.6 km
- Barsana BARS 56.9 km
- Brij Nagar BINR 62.9 km
- Jhareda JREA 69.6 km
- Govind Garh GVH 75.0 km
- Jadoli Ka Bas JBS 86.6 km
- Ramgarh RAH 95.1 km
- Ootwar OTD 105.7 km
- Gazika GZKA 113.9 km
- XX-AWRC XX-AWRC 117.2 km
Quick answers
How long is the Bhuteshwar – Alwar Chord Cabin line?
The Bhuteshwar – Alwar Chord Cabin line is about 117 km long, with 16 stations.
Is the Bhuteshwar – Alwar Chord Cabin line electrified?
Yes. The Bhuteshwar – Alwar Chord Cabin line is electrified: trains run on electric power from overhead wires.
Is Bhuteshwar – Alwar Chord Cabin a single or double line?
The Bhuteshwar – Alwar Chord Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Bhuteshwar – Alwar Chord Cabin line?
16 trains run over the Bhuteshwar – Alwar Chord Cabin line.