Bilaspur Bypass Cabin – Bilaspur Chord Cabin
Bilaspur Bypass Cabin – Bilaspur Chord Cabin (YY-BSPB–BCCB) railway line: 1 km, single electric broad gauge. 2 stations and 30 trains, South East Central Railway.
- Length
- 1 km
- Trains
- 30 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- YY-BSPB YY-BSPB 0.0 km
- Bilaspur Chord Cabin BCCB 1.1 km
Quick answers
How long is the Bilaspur Bypass Cabin – Bilaspur Chord Cabin line?
The Bilaspur Bypass Cabin – Bilaspur Chord Cabin line is about 1 km long, with 2 stations.
Is the Bilaspur Bypass Cabin – Bilaspur Chord Cabin line electrified?
Yes. The Bilaspur Bypass Cabin – Bilaspur Chord Cabin line is electrified: trains run on electric power from overhead wires.
Is Bilaspur Bypass Cabin – Bilaspur Chord Cabin a single or double line?
The Bilaspur Bypass Cabin – Bilaspur Chord Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Bilaspur Bypass Cabin – Bilaspur Chord Cabin line?
30 trains run over the Bilaspur Bypass Cabin – Bilaspur Chord Cabin line.