RailTribe
Lines
Map
Trains
Line

Bilaspur Chord Cabin – Bilaspur Junction

Bilaspur Chord Cabin – Bilaspur Junction (BCCB–BSP) railway line: 3 km, double electric broad gauge. 2 stations and 28 trains, South East Central Railway.

Length
3 km
Trains
28 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 2

  1. Bilaspur Chord Cabin BCCB 0.0 km
  2. Bilaspur Jn BSP 3.3 km

Quick answers

How long is the Bilaspur Chord Cabin – Bilaspur Junction line?

The Bilaspur Chord Cabin – Bilaspur Junction line is about 3 km long, with 2 stations.

Is the Bilaspur Chord Cabin – Bilaspur Junction line electrified?

Yes. The Bilaspur Chord Cabin – Bilaspur Junction line is electrified: trains run on electric power from overhead wires.

Is Bilaspur Chord Cabin – Bilaspur Junction a single or double line?

The Bilaspur Chord Cabin – Bilaspur Junction line is a double line. One track for each direction, so trains do not wait to cross.

How many trains use the Bilaspur Chord Cabin – Bilaspur Junction line?

28 trains run over the Bilaspur Chord Cabin – Bilaspur Junction line.

Indian railway atlas