RailTribe
Lines
Map
Trains
Line

Bilaspur Junction – Bilaspur Bypass Cabin

Bilaspur Junction – Bilaspur Bypass Cabin (BSP–YY-BSPB) railway line: 3 km, triple electric broad gauge. 2 stations and 120 trains, South East Central Railway.

Length
3 km
Trains
120 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Triple lineAn extra track that lets more trains run.

Stations on this line · 2

  1. Bilaspur Jn BSP 0.0 km
  2. YY-BSPB YY-BSPB 3.4 km

Quick answers

How long is the Bilaspur Junction – Bilaspur Bypass Cabin line?

The Bilaspur Junction – Bilaspur Bypass Cabin line is about 3 km long, with 2 stations.

Is the Bilaspur Junction – Bilaspur Bypass Cabin line electrified?

Yes. The Bilaspur Junction – Bilaspur Bypass Cabin line is electrified: trains run on electric power from overhead wires.

Is Bilaspur Junction – Bilaspur Bypass Cabin a single or double line?

The Bilaspur Junction – Bilaspur Bypass Cabin line is a triple line. An extra track that lets more trains run.

How many trains use the Bilaspur Junction – Bilaspur Bypass Cabin line?

120 trains run over the Bilaspur Junction – Bilaspur Bypass Cabin line.

Indian railway atlas