RailTribe
Lines
Map
Trains
Line

Bilimora Junction – Udhna Bypass Cabin

Bilimora Junction – Udhna Bypass Cabin (BIM–XX-UDNB) railway line: 43 km, double electric broad gauge. 11 stations and 338 trains, Western Railway.

Length
43 km
Speed limit
130 km/h
Trains
338 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 11

  1. Bilimora Jn BIM 0.0 km
  2. Amalsad AML 5.4 km
  3. Ancheli ACL 9.2 km
  4. Vedchha VDH 12.6 km
  5. Hansapore HXR 16.5 km
  6. Gandhi Smriti GNST 17.9 km
  7. Navsari NVS 21.1 km
  8. Maroli MRL 29.5 km
  9. Sachin SCH 36.1 km
  10. Bhestan BHET 41.2 km
  11. XX-UDNB XX-UDNB 43.5 km

Quick answers

How long is the Bilimora Junction – Udhna Bypass Cabin line?

The Bilimora Junction – Udhna Bypass Cabin line is about 43 km long, with 11 stations.

Is the Bilimora Junction – Udhna Bypass Cabin line electrified?

Yes. The Bilimora Junction – Udhna Bypass Cabin line is electrified: trains run on electric power from overhead wires.

Is Bilimora Junction – Udhna Bypass Cabin a single or double line?

The Bilimora Junction – Udhna Bypass Cabin line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Bilimora Junction and Udhna Bypass Cabin?

Trains can run at up to 130 km/h between Bilimora Junction and Udhna Bypass Cabin.

How many trains use the Bilimora Junction – Udhna Bypass Cabin line?

338 trains run over the Bilimora Junction – Udhna Bypass Cabin line.

Indian railway atlas