Bimalgarh Junction – Barsuan
Bimalgarh Junction – Barsuan (BUF–BXF) railway line: 21 km, single electric broad gauge. 3 stations and 2 trains, South Eastern Railway.
- Length
- 21 km
- Speed limit
- 65 km/h
- Trains
- 2 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 3
- Bimalgarh Jn BUF 0.0 km
- Gaganaposh GAX 6.8 km
- Barsuan BXF 21.3 km
Quick answers
How long is the Bimalgarh Junction – Barsuan line?
The Bimalgarh Junction – Barsuan line is about 21 km long, with 3 stations.
Is the Bimalgarh Junction – Barsuan line electrified?
Yes. The Bimalgarh Junction – Barsuan line is electrified: trains run on electric power from overhead wires.
Is Bimalgarh Junction – Barsuan a single or double line?
The Bimalgarh Junction – Barsuan line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Bimalgarh Junction and Barsuan?
Trains can run at up to 65 km/h between Bimalgarh Junction and Barsuan.
How many trains use the Bimalgarh Junction – Barsuan line?
2 trains run over the Bimalgarh Junction – Barsuan line.