RailTribe
Lines
Map
Trains
Line

Birur Junction – Chikjajur Junction

Birur Junction – Chikjajur Junction (RRB–JRU) railway line: 68 km, double electric broad gauge. 10 stations and 85 trains, South Western Railway.

Length
68 km
Speed limit
110 km/h
Trains
85 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 10

  1. Birur Jn RRB 0.0 km
  2. Nagavangala NVF 9.9 km
  3. Ajjampura AJP 18.1 km
  4. Shivani SHV 28.6 km
  5. Hosadurga Road HSD 38.6 km
  6. Arabagatta Halt ABGT 42.3 km
  7. Ramagiri RGI 48.4 km
  8. Nulenur NLNR 54.8 km
  9. Holalkere HLK 58.8 km
  10. Chikjajur Jn JRU 68.2 km

Quick answers

How long is the Birur Junction – Chikjajur Junction line?

The Birur Junction – Chikjajur Junction line is about 68 km long, with 10 stations.

Is the Birur Junction – Chikjajur Junction line electrified?

Yes. The Birur Junction – Chikjajur Junction line is electrified: trains run on electric power from overhead wires.

Is Birur Junction – Chikjajur Junction a single or double line?

The Birur Junction – Chikjajur Junction line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Birur Junction and Chikjajur Junction?

Trains can run at up to 110 km/h between Birur Junction and Chikjajur Junction.

How many trains use the Birur Junction – Chikjajur Junction line?

85 trains run over the Birur Junction – Chikjajur Junction line.

Indian railway atlas