Bobbili Junction – Salur
Bobbili Junction – Salur (VBL–SALR) railway line: 16 km, single electric broad gauge. 5 stations, South Coast Railway.
- Length
- 16 km
- Speed limit
- 40 km/h
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 5
- Bobbili Jn VBL 0.0 km
- Narayanappavalasa Halt NGJA 5.8 km
- Rompalle RML 9.9 km
- Parannavalasa PNVA 11.3 km
- Salur SALR 16.4 km
Quick answers
How long is the Bobbili Junction – Salur line?
The Bobbili Junction – Salur line is about 16 km long, with 5 stations.
Is the Bobbili Junction – Salur line electrified?
Yes. The Bobbili Junction – Salur line is electrified: trains run on electric power from overhead wires.
Is Bobbili Junction – Salur a single or double line?
The Bobbili Junction – Salur line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Bobbili Junction and Salur?
Trains can run at up to 40 km/h between Bobbili Junction and Salur.