Chalsa – Metelli
Chalsa – Metelli (CLD–MATD) railway line: 9 km, single metre gauge. 3 stations, Northeast Frontier Railway.
- Length
- 9 km
- Track
- Metre gaugeRails 1,000 mm apart: an older, narrower track. Only a few lines remain.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- Gauge ConversionThe track is being converted to broad gauge.
Stations on this line · 3
Quick answers
How long is the Chalsa – Metelli line?
The Chalsa – Metelli line is about 9 km long, with 3 stations.
Is Chalsa – Metelli a single or double line?
The Chalsa – Metelli line is a single line. Trains in both directions share one track and wait at stations to cross.