Chandigarh Junction – Morinda Junction Cabin
Chandigarh Junction – Morinda Junction Cabin (CDG–JNCV) railway line: 42 km, single electric broad gauge. 4 stations and 42 trains, Northern Railway.
- Length
- 42 km
- Speed limit
- 110 km/h
- Trains
- 42 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 4
- Chandigarh Jn CDG 0.0 km
- SAS Nagar Mohali SASN 11.2 km
- Kharar KARR 27.6 km
- Morinda Jn Cabin JNCV 41.6 km
Quick answers
How long is the Chandigarh Junction – Morinda Junction Cabin line?
The Chandigarh Junction – Morinda Junction Cabin line is about 42 km long, with 4 stations.
Is the Chandigarh Junction – Morinda Junction Cabin line electrified?
Yes. The Chandigarh Junction – Morinda Junction Cabin line is electrified: trains run on electric power from overhead wires.
Is Chandigarh Junction – Morinda Junction Cabin a single or double line?
The Chandigarh Junction – Morinda Junction Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Chandigarh Junction and Morinda Junction Cabin?
Trains can run at up to 110 km/h between Chandigarh Junction and Morinda Junction Cabin.
How many trains use the Chandigarh Junction – Morinda Junction Cabin line?
42 trains run over the Chandigarh Junction – Morinda Junction Cabin line.