Chhapra Junction – New Manjhi
Chhapra Junction – New Manjhi (CPR–NMHI) railway line: 14 km, double electric broad gauge. 15 stations and 87 trains, North Eastern Railway.
- Length
- 14 km
- Trains
- 87 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 15
- Chhapra Jn CPR 0.0 km
- Gautamsthan GTST 8.9 km
- Revelganj Ghat Halt RVG 11.1 km
- New Manjhi NMHI 13.8 km
- Manjhi MHT 16.7 km
- Bakulha BKLA 22.4 km
- Suraimanpur SIP 29.1 km
- Dal Chhapra DCP 35.3 km
- Reoti ROI 40.5 km
- Sahatwar STW 48.8 km
- Chhata Aschaura CATA 53.5 km
- Bansdih Road BCD 57.1 km
- Ballia BUI 66.2 km
- Sagarpali SVI 71.3 km
- Phephna Jn PEP 76.3 km
Quick answers
How long is the Chhapra Junction – New Manjhi line?
The Chhapra Junction – New Manjhi line is about 14 km long, with 15 stations.
Is the Chhapra Junction – New Manjhi line electrified?
Yes. The Chhapra Junction – New Manjhi line is electrified: trains run on electric power from overhead wires.
Is Chhapra Junction – New Manjhi a single or double line?
The Chhapra Junction – New Manjhi line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Chhapra Junction – New Manjhi line?
87 trains run over the Chhapra Junction – New Manjhi line.