Chhota Ambana – Barakar
Chhota Ambana – Barakar (CAM–BRR) railway line: 26 km, double electric broad gauge. 8 stations and 125 trains, Eastern Railway.
- Length
- 26 km
- Speed limit
- 130 km/h
- Trains
- 125 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 8
- Pradhankhunta Jn PKA 0.0 km
- Chhota Ambana CAM 5.8 km
- Kalubathan KAO 15.1 km
- Thapar Nagar TNW 19.4 km
- Mugma MMU 24.8 km
- Kumardubi KMME 29.4 km
- Barakar BRR 32.0 km
- Kulti ULT 35.1 km
Quick answers
How long is the Chhota Ambana – Barakar line?
The Chhota Ambana – Barakar line is about 26 km long, with 8 stations.
Is the Chhota Ambana – Barakar line electrified?
Yes. The Chhota Ambana – Barakar line is electrified: trains run on electric power from overhead wires.
Is Chhota Ambana – Barakar a single or double line?
The Chhota Ambana – Barakar line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Chhota Ambana and Barakar?
Trains can run at up to 130 km/h between Chhota Ambana and Barakar.
How many trains use the Chhota Ambana – Barakar line?
125 trains run over the Chhota Ambana – Barakar line.