RailTribe
Lines
Map
Trains
Line

Chikka Banavara Junction – Tumakuru

Chikka Banavara Junction – Tumakuru (BAW–TK) railway line: 56 km, double electric broad gauge. 12 stations and 107 trains, South Western Railway.

Length
56 km
Speed limit
110 km/h
Trains
107 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 12

  1. Chikka Banavara Jn BAW 0.0 km
  2. Soldevanahalli SDVL 2.4 km
  3. Golhalli GHL 12.4 km
  4. Bhairanayakanahalli BNKH 19.0 km
  5. Dodbele DBL 23.4 km
  6. Muddalinganahalli Halt MDLL 30.4 km
  7. Nidvanda NDV 32.8 km
  8. Dobbspet DBS 35.8 km
  9. Hirehalli HHL 44.3 km
  10. Kyatsandra Depot KDAG 49.6 km
  11. Kyatsandra KIAT 50.4 km
  12. Tumakuru TK 55.8 km

Quick answers

How long is the Chikka Banavara Junction – Tumakuru line?

The Chikka Banavara Junction – Tumakuru line is about 56 km long, with 12 stations.

Is the Chikka Banavara Junction – Tumakuru line electrified?

Yes. The Chikka Banavara Junction – Tumakuru line is electrified: trains run on electric power from overhead wires.

Is Chikka Banavara Junction – Tumakuru a single or double line?

The Chikka Banavara Junction – Tumakuru line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Chikka Banavara Junction and Tumakuru?

Trains can run at up to 110 km/h between Chikka Banavara Junction and Tumakuru.

How many trains use the Chikka Banavara Junction – Tumakuru line?

107 trains run over the Chikka Banavara Junction – Tumakuru line.

Indian railway atlas