Chitoda – Sewagram Junction
Chitoda – Sewagram Junction (CHJC–SEGM) railway line: 4 km, triple electric broad gauge. 2 stations and 161 trains, Central Railway.
- Length
- 4 km
- Trains
- 161 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Triple lineAn extra track that lets more trains run.
Stations on this line · 2
- Chitoda CHJC 0.0 km
- Sewagram Jn SEGM 3.9 km
Quick answers
How long is the Chitoda – Sewagram Junction line?
The Chitoda – Sewagram Junction line is about 4 km long, with 2 stations.
Is the Chitoda – Sewagram Junction line electrified?
Yes. The Chitoda – Sewagram Junction line is electrified: trains run on electric power from overhead wires.
Is Chitoda – Sewagram Junction a single or double line?
The Chitoda – Sewagram Junction line is a triple line. An extra track that lets more trains run.
How many trains use the Chitoda – Sewagram Junction line?
161 trains run over the Chitoda – Sewagram Junction line.