RailTribe
Lines
Map
Trains
Line

Chitra – Basukinath

Chitra – Basukinath (CHTA–BSKH) railway line: 38 km, single broad gauge. 2 stations, East Coast Railway.

Length
38 km
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.
Work
New LineThis is a new line under construction.

Stations on this line · 2

  1. CHTA CHTA 0.0 km
  2. Basukinath BSKH 37.9 km

Quick answers

How long is the Chitra – Basukinath line?

The Chitra – Basukinath line is about 38 km long, with 2 stations.

Is Chitra – Basukinath a single or double line?

The Chitra – Basukinath line is a single line. Trains in both directions share one track and wait at stations to cross.

Indian railway atlas