Choranda Junction – Moti Koral
Choranda Junction – Moti Koral (CRND–MKRL) railway line: 19 km, single metre gauge. 5 stations, Western Railway.
- Length
- 19 km
- Track
- Metre gaugeRails 1,000 mm apart: an older, narrower track. Only a few lines remain.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- Gauge ConversionThe track is being converted to broad gauge.
Stations on this line · 5
- Choranda Jn CRND 0.0 km
- Bachar BCHR 4.7 km
- Saniyad SNAD 8.9 km
- Nareshwar Road NRUR 14.4 km
- Moti Koral MKRL 18.6 km
Quick answers
How long is the Choranda Junction – Moti Koral line?
The Choranda Junction – Moti Koral line is about 19 km long, with 5 stations.
Is Choranda Junction – Moti Koral a single or double line?
The Choranda Junction – Moti Koral line is a single line. Trains in both directions share one track and wait at stations to cross.