RailTribe
Lines
Map
Trains
Line

Erode Junction – Karur Junction

Erode Junction – Karur Junction (ED–KRR) railway line: 65 km, single electric broad gauge. 10 stations and 40 trains, Southern Railway.

Length
65 km
Speed limit
110 km/h
Trains
40 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.
Work
DoublingA second track is being built.

Stations on this line · 10

  1. Erode Jn ED 0.0 km
  2. Chavadipalaiyam CVD 11.5 km
  3. Pasur PAS 18.9 km
  4. Kolanalli CNY 26.4 km
  5. Unjalur URL 32.4 km
  6. Kodumudi KMD 38.4 km
  7. NOY NOY 43.9 km
  8. Pugalur PGR 50.5 km
  9. Murthipalayam MPLM 55.3 km
  10. Karur Jn KRR 64.9 km

Quick answers

How long is the Erode Junction – Karur Junction line?

The Erode Junction – Karur Junction line is about 65 km long, with 10 stations.

Is the Erode Junction – Karur Junction line electrified?

Yes. The Erode Junction – Karur Junction line is electrified: trains run on electric power from overhead wires.

Is Erode Junction – Karur Junction a single or double line?

The Erode Junction – Karur Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Erode Junction and Karur Junction?

Trains can run at up to 110 km/h between Erode Junction and Karur Junction.

How many trains use the Erode Junction – Karur Junction line?

40 trains run over the Erode Junction – Karur Junction line.

Indian railway atlas