Gadag Junction – Koppal
Gadag Junction – Koppal (GDG–KBL) railway line: 57 km, double electric broad gauge. 10 stations and 42 trains, South Western Railway.
- Length
- 57 km
- Trains
- 42 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 10
- Gadag Jn GDG 0.0 km
- Kanginhal KGX 8.7 km
- Harlapur RLP 18.1 km
- Halligudi HAG 22.9 km
- Sompur Road SOQ 27.0 km
- Banni Koppa BNA 34.5 km
- Talakal TLKL 41.4 km
- Bhanapur BNP 45.2 km
- Koppal KBL 57.3 km
- Ginigera Jn GIN 68.5 km
Quick answers
How long is the Gadag Junction – Koppal line?
The Gadag Junction – Koppal line is about 57 km long, with 10 stations.
Is the Gadag Junction – Koppal line electrified?
Yes. The Gadag Junction – Koppal line is electrified: trains run on electric power from overhead wires.
Is Gadag Junction – Koppal a single or double line?
The Gadag Junction – Koppal line is a double line. One track for each direction, so trains do not wait to cross.
How many trains use the Gadag Junction – Koppal line?
42 trains run over the Gadag Junction – Koppal line.