RailTribe
Lines
Map
Trains
Line

Ginigera Junction – Hosapete A Cabin

Ginigera Junction – Hosapete A Cabin (GIN–YY-HPTA) railway line: 15 km, double electric broad gauge. 4 stations and 36 trains, South Western Railway.

Length
15 km
Speed limit
100 km/h
Trains
36 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 4

  1. Ginigera Jn GIN 0.0 km
  2. Hitnal HTNL 7.0 km
  3. Munirabad MRB 10.7 km
  4. YY-HPTA YY-HPTA 15.2 km

Quick answers

How long is the Ginigera Junction – Hosapete A Cabin line?

The Ginigera Junction – Hosapete A Cabin line is about 15 km long, with 4 stations.

Is the Ginigera Junction – Hosapete A Cabin line electrified?

Yes. The Ginigera Junction – Hosapete A Cabin line is electrified: trains run on electric power from overhead wires.

Is Ginigera Junction – Hosapete A Cabin a single or double line?

The Ginigera Junction – Hosapete A Cabin line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Ginigera Junction and Hosapete A Cabin?

Trains can run at up to 100 km/h between Ginigera Junction and Hosapete A Cabin.

How many trains use the Ginigera Junction – Hosapete A Cabin line?

36 trains run over the Ginigera Junction – Hosapete A Cabin line.

Indian railway atlas