Ginigera Junction – Hosapete A Cabin
Ginigera Junction – Hosapete A Cabin (GIN–YY-HPTA) railway line: 15 km, double electric broad gauge. 4 stations and 36 trains, South Western Railway.
- Length
- 15 km
- Speed limit
- 100 km/h
- Trains
- 36 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 4
- Ginigera Jn GIN 0.0 km
- Hitnal HTNL 7.0 km
- Munirabad MRB 10.7 km
- YY-HPTA YY-HPTA 15.2 km
Quick answers
How long is the Ginigera Junction – Hosapete A Cabin line?
The Ginigera Junction – Hosapete A Cabin line is about 15 km long, with 4 stations.
Is the Ginigera Junction – Hosapete A Cabin line electrified?
Yes. The Ginigera Junction – Hosapete A Cabin line is electrified: trains run on electric power from overhead wires.
Is Ginigera Junction – Hosapete A Cabin a single or double line?
The Ginigera Junction – Hosapete A Cabin line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Ginigera Junction and Hosapete A Cabin?
Trains can run at up to 100 km/h between Ginigera Junction and Hosapete A Cabin.
How many trains use the Ginigera Junction – Hosapete A Cabin line?
36 trains run over the Ginigera Junction – Hosapete A Cabin line.