RailTribe
Lines
Map
Trains
Line

Got – Kashipur Junction

Got – Kashipur Junction (GOT–KPV) railway line: 43 km, single electric broad gauge. 9 stations and 20 trains, North Eastern Railway.

Length
43 km
Speed limit
110 km/h
Trains
20 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 9

  1. Katghar East Cabin KGFE 0.0 km
  2. Got GOT 1.5 km
  3. Sehal SEW 6.9 km
  4. Pipalsana PLS 13.7 km
  5. Jalpur JLQ 18.9 km
  6. Roshanpur RHN 23.6 km
  7. Padiya Nagla PAQ 28.7 km
  8. Aliganj ALJ 33.5 km
  9. Kashipur Jn KPV 44.4 km

Quick answers

How long is the Got – Kashipur Junction line?

The Got – Kashipur Junction line is about 43 km long, with 9 stations.

Is the Got – Kashipur Junction line electrified?

Yes. The Got – Kashipur Junction line is electrified: trains run on electric power from overhead wires.

Is Got – Kashipur Junction a single or double line?

The Got – Kashipur Junction line is a single line. Trains in both directions share one track and wait at stations to cross.

What is the speed limit between Got and Kashipur Junction?

Trains can run at up to 110 km/h between Got and Kashipur Junction.

How many trains use the Got – Kashipur Junction line?

20 trains run over the Got – Kashipur Junction line.

Indian railway atlas