Gua – Bara Jamda Junction
Gua – Bara Jamda Junction (GUA–BJMD) railway line: 9 km, single electric broad gauge. 2 stations and 4 trains, South Eastern Railway.
- Length
- 9 km
- Speed limit
- 65 km/h
- Trains
- 4 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 2
- Gua GUA 0.0 km
- Bara Jamda Jn BJMD 8.8 km
Quick answers
How long is the Gua – Bara Jamda Junction line?
The Gua – Bara Jamda Junction line is about 9 km long, with 2 stations.
Is the Gua – Bara Jamda Junction line electrified?
Yes. The Gua – Bara Jamda Junction line is electrified: trains run on electric power from overhead wires.
Is Gua – Bara Jamda Junction a single or double line?
The Gua – Bara Jamda Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Gua and Bara Jamda Junction?
Trains can run at up to 65 km/h between Gua and Bara Jamda Junction.
How many trains use the Gua – Bara Jamda Junction line?
4 trains run over the Gua – Bara Jamda Junction line.