Harmuti Junction – Bogibeel Bridge North Block Hut
Harmuti Junction – Bogibeel Bridge North Block Hut (HMY–BBNB) railway line: 116 km, single electric broad gauge. 17 stations and 25 trains, Northeast Frontier Railway.
- Length
- 116 km
- Speed limit
- 100 km/h
- Trains
- 25 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 17
- Harmuti Jn HMY 0.0 km
- Tunijan TUJ 3.9 km
- Kathal Pukhuri KTPR 13.0 km
- Silonibari SOB 19.9 km
- North Lakhimpur NLP 29.9 km
- Lilabari LBI 38.4 km
- Siajuli SWJ 47.1 km
- Baginadi BGND 55.3 km
- Subansiri SUZ 65.3 km
- Gogamukh GOM 73.6 km
- Na Nadi NOD 78.8 km
- Bordoloni BDLN 85.7 km
- Jiadhal JFD 93.4 km
- Dhemaji DMC 99.1 km
- Moridhal MYO 106.7 km
- Sripani SRPN 111.3 km
- Bogibeel Bridge North Block Hut BBNB 115.8 km
Quick answers
How long is the Harmuti Junction – Bogibeel Bridge North Block Hut line?
The Harmuti Junction – Bogibeel Bridge North Block Hut line is about 116 km long, with 17 stations.
Is the Harmuti Junction – Bogibeel Bridge North Block Hut line electrified?
Yes. The Harmuti Junction – Bogibeel Bridge North Block Hut line is electrified: trains run on electric power from overhead wires.
Is Harmuti Junction – Bogibeel Bridge North Block Hut a single or double line?
The Harmuti Junction – Bogibeel Bridge North Block Hut line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Harmuti Junction and Bogibeel Bridge North Block Hut?
Trains can run at up to 100 km/h between Harmuti Junction and Bogibeel Bridge North Block Hut.
How many trains use the Harmuti Junction – Bogibeel Bridge North Block Hut line?
25 trains run over the Harmuti Junction – Bogibeel Bridge North Block Hut line.