RailTribe
Lines
Map
Trains
Line

Hisar Bypass Cabin – Bawani Khera

Hisar Bypass Cabin – Bawani Khera (XX-HSRC–BWK) railway line: 38 km, single electric broad gauge. 9 stations and 34 trains, North Western Railway.

Length
38 km
Trains
34 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 9

  1. XX-HSRC XX-HSRC 0.0 km
  2. Satrod STD 6.1 km
  3. Mayar MAYR 10.2 km
  4. Hansi Jn HNS 18.6 km
  5. Aurang Nagar AUN 25.8 km
  6. Jita Kheri JKZ 28.3 km
  7. Bawani Khera BWK 37.5 km
  8. Sui SUI 46.6 km
  9. Bhiwani Jn BNW 55.4 km

Quick answers

How long is the Hisar Bypass Cabin – Bawani Khera line?

The Hisar Bypass Cabin – Bawani Khera line is about 38 km long, with 9 stations.

Is the Hisar Bypass Cabin – Bawani Khera line electrified?

Yes. The Hisar Bypass Cabin – Bawani Khera line is electrified: trains run on electric power from overhead wires.

Is Hisar Bypass Cabin – Bawani Khera a single or double line?

The Hisar Bypass Cabin – Bawani Khera line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Hisar Bypass Cabin – Bawani Khera line?

34 trains run over the Hisar Bypass Cabin – Bawani Khera line.

Indian railway atlas