Hisar Bypass Cabin – Bawani Khera
Hisar Bypass Cabin – Bawani Khera (XX-HSRC–BWK) railway line: 38 km, single electric broad gauge. 9 stations and 34 trains, North Western Railway.
- Length
- 38 km
- Trains
- 34 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
Stations on this line · 9
- XX-HSRC XX-HSRC 0.0 km
- Satrod STD 6.1 km
- Mayar MAYR 10.2 km
- Hansi Jn HNS 18.6 km
- Aurang Nagar AUN 25.8 km
- Jita Kheri JKZ 28.3 km
- Bawani Khera BWK 37.5 km
- Sui SUI 46.6 km
- Bhiwani Jn BNW 55.4 km
Quick answers
How long is the Hisar Bypass Cabin – Bawani Khera line?
The Hisar Bypass Cabin – Bawani Khera line is about 38 km long, with 9 stations.
Is the Hisar Bypass Cabin – Bawani Khera line electrified?
Yes. The Hisar Bypass Cabin – Bawani Khera line is electrified: trains run on electric power from overhead wires.
Is Hisar Bypass Cabin – Bawani Khera a single or double line?
The Hisar Bypass Cabin – Bawani Khera line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Hisar Bypass Cabin – Bawani Khera line?
34 trains run over the Hisar Bypass Cabin – Bawani Khera line.