RailTribe
Lines
Map
Trains
Line

Jaipur Junction – Dausa Junction

Jaipur Junction – Dausa Junction (JP–DO) railway line: 62 km, double electric broad gauge. 11 stations and 137 trains, North Western Railway.

Length
62 km
Speed limit
130 km/h
Trains
137 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Double lineOne track for each direction, so trains do not wait to cross.

Stations on this line · 11

  1. Jaipur Jn JP 0.0 km
  2. Gandhi Nagar Jaipur GADJ 5.4 km
  3. Getor Jagatpura GTJT 10.9 km
  4. Khatipura KWP 16.8 km
  5. Kanauta KUT 23.4 km
  6. Bassi BAI 32.6 km
  7. Jhir JHIR 39.5 km
  8. Banskho BSKO 41.9 km
  9. Jatwara JW 49.7 km
  10. Bhandana BNDN 53.7 km
  11. Dausa Jn DO 61.5 km

Quick answers

How long is the Jaipur Junction – Dausa Junction line?

The Jaipur Junction – Dausa Junction line is about 62 km long, with 11 stations.

Is the Jaipur Junction – Dausa Junction line electrified?

Yes. The Jaipur Junction – Dausa Junction line is electrified: trains run on electric power from overhead wires.

Is Jaipur Junction – Dausa Junction a single or double line?

The Jaipur Junction – Dausa Junction line is a double line. One track for each direction, so trains do not wait to cross.

What is the speed limit between Jaipur Junction and Dausa Junction?

Trains can run at up to 130 km/h between Jaipur Junction and Dausa Junction.

How many trains use the Jaipur Junction – Dausa Junction line?

137 trains run over the Jaipur Junction – Dausa Junction line.

Indian railway atlas