Jaipur Junction – Sawai Madhopur Junction
Jaipur Junction – Sawai Madhopur Junction (JP–SWM) railway line: 132 km, single electric broad gauge. 14 stations and 79 trains, North Western Railway.
- Length
- 132 km
- Speed limit
- 110 km/h
- Trains
- 79 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- DoublingA second track is being built.
Stations on this line · 14
- Jaipur Jn JP 0.0 km
- Bais Godam BSGD 2.2 km
- Durgapura DPA 7.4 km
- Sanganer SNGN 12.2 km
- Sheodaspura Padampura SAS 29.3 km
- Chaksu CKS 42.7 km
- Channani CHNN 53.1 km
- Banasthali Niwai BNLW 66.0 km
- Siras SRAS 81.8 km
- Isarda ISA 91.9 km
- Sureli SURL 100.6 km
- Chauth ka Barwara CKB 109.8 km
- Devpura DPZ 120.8 km
- Sawai Madhopur Jn SWM 131.8 km
Quick answers
How long is the Jaipur Junction – Sawai Madhopur Junction line?
The Jaipur Junction – Sawai Madhopur Junction line is about 132 km long, with 14 stations.
Is the Jaipur Junction – Sawai Madhopur Junction line electrified?
Yes. The Jaipur Junction – Sawai Madhopur Junction line is electrified: trains run on electric power from overhead wires.
Is Jaipur Junction – Sawai Madhopur Junction a single or double line?
The Jaipur Junction – Sawai Madhopur Junction line is a single line. Trains in both directions share one track and wait at stations to cross.
What is the speed limit between Jaipur Junction and Sawai Madhopur Junction?
Trains can run at up to 110 km/h between Jaipur Junction and Sawai Madhopur Junction.
How many trains use the Jaipur Junction – Sawai Madhopur Junction line?
79 trains run over the Jaipur Junction – Sawai Madhopur Junction line.