Jamalpur New Quarry Siding – Bhagalpur Junction
Jamalpur New Quarry Siding – Bhagalpur Junction (JNQS–BGP) railway line: 52 km, double electric broad gauge. 18 stations and 94 trains, Eastern Railway.
- Length
- 52 km
- Speed limit
- 110 km/h
- Trains
- 94 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
- Work
- TriplingA third track is being built.
Stations on this line · 18
- Jamalpur New Quarry Siding JNQS 0.0 km
- Patam Halt PATM 3.4 km
- Ratanpur RPUR 4.7 km
- Rishikund Halt RIKD 7.7 km
- Bariarpur BUP 9.7 km
- Kalyanpur Road KPRD 14.3 km
- Ghorghat Halt GOG 16.5 km
- Khariapipra Halt KAPP 18.4 km
- Ganganiyan GNNA 20.4 km
- Kamarganj Halt KMGH 22.6 km
- SultanGanj SGG 27.5 km
- Abjuganj Halt AJUG 29.6 km
- Maheshi MVV 33.3 km
- Akbarnagar AKN 37.6 km
- Chhit Makandpur CTMP 41.2 km
- Murarpur MPY 42.9 km
- Nathnagar NAT 47.8 km
- Bhagalpur Jn BGP 51.7 km
Quick answers
How long is the Jamalpur New Quarry Siding – Bhagalpur Junction line?
The Jamalpur New Quarry Siding – Bhagalpur Junction line is about 52 km long, with 18 stations.
Is the Jamalpur New Quarry Siding – Bhagalpur Junction line electrified?
Yes. The Jamalpur New Quarry Siding – Bhagalpur Junction line is electrified: trains run on electric power from overhead wires.
Is Jamalpur New Quarry Siding – Bhagalpur Junction a single or double line?
The Jamalpur New Quarry Siding – Bhagalpur Junction line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Jamalpur New Quarry Siding and Bhagalpur Junction?
Trains can run at up to 110 km/h between Jamalpur New Quarry Siding and Bhagalpur Junction.
How many trains use the Jamalpur New Quarry Siding – Bhagalpur Junction line?
94 trains run over the Jamalpur New Quarry Siding – Bhagalpur Junction line.