RailTribe
Lines
Map
Trains
Line

Jamalpur New Quarry Siding – Jamalpur Link Cabin

Jamalpur New Quarry Siding – Jamalpur Link Cabin (JNQS–DLTR) railway line: 1 km, single electric broad gauge. 2 stations and 10 trains, Eastern Railway.

Length
1 km
Trains
10 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
ElectricTrains take power from overhead wires.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.

Stations on this line · 2

  1. Jamalpur New Quarry Siding JNQS 0.0 km
  2. Jamalpur Link Cabin DLTR 0.7 km

Quick answers

How long is the Jamalpur New Quarry Siding – Jamalpur Link Cabin line?

The Jamalpur New Quarry Siding – Jamalpur Link Cabin line is about 1 km long, with 2 stations.

Is the Jamalpur New Quarry Siding – Jamalpur Link Cabin line electrified?

Yes. The Jamalpur New Quarry Siding – Jamalpur Link Cabin line is electrified: trains run on electric power from overhead wires.

Is Jamalpur New Quarry Siding – Jamalpur Link Cabin a single or double line?

The Jamalpur New Quarry Siding – Jamalpur Link Cabin line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Jamalpur New Quarry Siding – Jamalpur Link Cabin line?

10 trains run over the Jamalpur New Quarry Siding – Jamalpur Link Cabin line.

Indian railway atlas