RailTribe
Lines
Map
Trains
Line

Jiribam – Khongsang

Jiribam – Khongsang (JRBM–KGBP) railway line: 54 km, single diesel broad gauge. 19 stations and 2 trains, Northeast Frontier Railway.

Length
54 km
Trains
2 run on this section
Track
Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
Power
DieselNo overhead wires, so trains are hauled by diesel engines.
Tracks
Single lineTrains in both directions share one track and wait at stations to cross.
Work
ElectrificationOverhead wires are being installed.

Stations on this line · 19

  1. Arunachal Jn ARCL 0.0 km
  2. New Silchar NSCL 3.7 km
  3. Moinarband MRBD 11.3 km
  4. Ranigaon RNGN 21.8 km
  5. Sribar SIBR 29.8 km
  6. Kamranga KMNG 36.1 km
  7. Jirighat JIGT 45.8 km
  8. Jiribam JRBM 49.7 km
  9. Vangaichungpao VNGP 60.6 km
  10. Rani Gaidinliu RGBP 72.6 km
  11. Haipo Jadonang KBBP 79.9 km
  12. Thingou TGBP 94.7 km
  13. Khongsang KGBP 103.6 km
  14. Awangkhal AWGKL 112.3 km
  15. Noney NONEY 122.9 km
  16. Tupul TUPUL 131.9 km
  17. Haochong HACHN 139.1 km
  18. Phayeng PHYNG 150.3 km
  19. Imphal IMPAL 158.7 km

Quick answers

How long is the Jiribam – Khongsang line?

The Jiribam – Khongsang line is about 54 km long, with 19 stations.

Is the Jiribam – Khongsang line electrified?

No. The Jiribam – Khongsang line is not electrified: trains use diesel engines.

Is Jiribam – Khongsang a single or double line?

The Jiribam – Khongsang line is a single line. Trains in both directions share one track and wait at stations to cross.

How many trains use the Jiribam – Khongsang line?

2 trains run over the Jiribam – Khongsang line.

Indian railway atlas