Jiribam – Khongsang
Jiribam – Khongsang (JRBM–KGBP) railway line: 54 km, single diesel broad gauge. 19 stations and 2 trains, Northeast Frontier Railway.
- Length
- 54 km
- Trains
- 2 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- DieselNo overhead wires, so trains are hauled by diesel engines.
- Tracks
- Single lineTrains in both directions share one track and wait at stations to cross.
- Work
- ElectrificationOverhead wires are being installed.
Stations on this line · 19
- Arunachal Jn ARCL 0.0 km
- New Silchar NSCL 3.7 km
- Moinarband MRBD 11.3 km
- Ranigaon RNGN 21.8 km
- Sribar SIBR 29.8 km
- Kamranga KMNG 36.1 km
- Jirighat JIGT 45.8 km
- Jiribam JRBM 49.7 km
- Vangaichungpao VNGP 60.6 km
- Rani Gaidinliu RGBP 72.6 km
- Haipo Jadonang KBBP 79.9 km
- Thingou TGBP 94.7 km
- Khongsang KGBP 103.6 km
- Awangkhal AWGKL 112.3 km
- Noney NONEY 122.9 km
- Tupul TUPUL 131.9 km
- Haochong HACHN 139.1 km
- Phayeng PHYNG 150.3 km
- Imphal IMPAL 158.7 km
Quick answers
How long is the Jiribam – Khongsang line?
The Jiribam – Khongsang line is about 54 km long, with 19 stations.
Is the Jiribam – Khongsang line electrified?
No. The Jiribam – Khongsang line is not electrified: trains use diesel engines.
Is Jiribam – Khongsang a single or double line?
The Jiribam – Khongsang line is a single line. Trains in both directions share one track and wait at stations to cross.
How many trains use the Jiribam – Khongsang line?
2 trains run over the Jiribam – Khongsang line.