Kalluru Junction – Gooty Cabin
Kalluru Junction – Gooty Cabin (KLU–GYJ) railway line: 27 km, double electric broad gauge. 6 stations and 63 trains, South Coast Railway.
- Length
- 27 km
- Speed limit
- 130 km/h
- Trains
- 63 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 6
- Kalluru Jn KLU 0.0 km
- Pamidi PMD 7.7 km
- Ramaraju Palli RRJ 14.8 km
- Thurakapalli TKPY 20.6 km
- YY-GYB YY-GYB 26.0 km
- Gooty Cabin GYJ 27.2 km
Quick answers
How long is the Kalluru Junction – Gooty Cabin line?
The Kalluru Junction – Gooty Cabin line is about 27 km long, with 6 stations.
Is the Kalluru Junction – Gooty Cabin line electrified?
Yes. The Kalluru Junction – Gooty Cabin line is electrified: trains run on electric power from overhead wires.
Is Kalluru Junction – Gooty Cabin a single or double line?
The Kalluru Junction – Gooty Cabin line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Kalluru Junction and Gooty Cabin?
Trains can run at up to 130 km/h between Kalluru Junction and Gooty Cabin.
How many trains use the Kalluru Junction – Gooty Cabin line?
63 trains run over the Kalluru Junction – Gooty Cabin line.