Kamakhya Junction – Thakurkuchi
Kamakhya Junction – Thakurkuchi (KYQ–TKC) railway line: 26 km, double electric broad gauge. 9 stations and 136 trains, Northeast Frontier Railway.
- Length
- 26 km
- Speed limit
- 90 km/h
- Trains
- 136 run on this section
- Track
- Broad gaugeRails 1,676 mm apart: the standard track width on India's main lines.
- Power
- ElectricTrains take power from overhead wires.
- Tracks
- Double lineOne track for each direction, so trains do not wait to cross.
Stations on this line · 9
- Kamakhya Jn KYQ 0.0 km
- Guwahati GHY 6.8 km
- New Guwahati NGC 11.0 km
- Noonmati NMY 12.5 km
- Narangi NNGE 15.2 km
- Panikhaiti PHI 20.7 km
- Thakurkuchi TKC 26.0 km
- Panbari PNB 33.3 km
- Digaru DGU 40.4 km
Quick answers
How long is the Kamakhya Junction – Thakurkuchi line?
The Kamakhya Junction – Thakurkuchi line is about 26 km long, with 9 stations.
Is the Kamakhya Junction – Thakurkuchi line electrified?
Yes. The Kamakhya Junction – Thakurkuchi line is electrified: trains run on electric power from overhead wires.
Is Kamakhya Junction – Thakurkuchi a single or double line?
The Kamakhya Junction – Thakurkuchi line is a double line. One track for each direction, so trains do not wait to cross.
What is the speed limit between Kamakhya Junction and Thakurkuchi?
Trains can run at up to 90 km/h between Kamakhya Junction and Thakurkuchi.
How many trains use the Kamakhya Junction – Thakurkuchi line?
136 trains run over the Kamakhya Junction – Thakurkuchi line.